Could America Face Another 1973-Style Shortage — This Time, Instead of Gasoline, It's Computing Power?

EDITOR'S COLUMN | ANALYSIS & PERSPECTIVE — REVIEW DRAFT
The oil crisis taught Americans what happens when a critical resource becomes scarce. Could computing power become the next bottleneck?
Remember the Gas Lines of the 1970s?
If you lived through the oil shocks of the 1970s, you may remember the long lines at gas stations. In some states, the last digit of your license plate determined which days you could purchase gasoline. Imagine needing fuel for work but being told today wasn't your day.
Now imagine opening an artificial intelligence service and seeing this message: Due to limited computing capacity, please try again tomorrow. Could America experience another shortage of a critical resource—this time, not gasoline, but compute?
From Gasoline Rationing to Digital Limits
A future computing shortage would not necessarily prevent ordinary phone calls or texts, which require relatively little processing power. It could, however, mean higher prices, waiting periods, or usage limits for AI and other compute-intensive services. Rationing by phone number is an illustration, not a forecast.
Oil Powered the Industrial Economy. Compute Powers the AI Economy.
Artificial intelligence depends on advanced semiconductor chips, data centers, and electricity. A bottleneck in any one of these resources can limit how quickly computing capacity expands.
America's New Supply-Chain Exposure
American companies lead in many areas of chip design and cloud computing, but semiconductor manufacturing is international. Some leading-edge chip production is concentrated in Taiwan, while equipment and materials come from multiple countries. An overseas supply disruption would not immediately turn off existing computers, but a prolonged interruption could slow replacement and expansion.
Electricity: The Other Side of the Equation
The U.S. Department of Energy estimated that data centers consumed approximately 4.4% of U.S. electricity in 2023 and projected a possible 6.7% to 12% share by 2028. These are projections, not guaranteed outcomes. Building more computing capacity also requires transmission, cooling, and dependable power.
Why This Matters to Texas
For Grimes County and surrounding Texas communities, new data center proposals raise questions about electrical demand, transmission infrastructure, local resources, and economic development. Those questions deserve attention before bottlenecks become acute.
Could History Repeat Itself?
The digital equivalent of gasoline rationing may never happen. But the principle is familiar: when demand outpaces supply of an essential resource, someone waits, pays more, or receives priority.
The question is no longer just how much artificial intelligence America can develop. It is whether America can build and sustain enough computing power to support the economy it is creating.
Terafab Texas is an independent news and public information service, not associated with SpaceX, Tesla, or xAI.



